Electricity

Electricity

Submitted by siteAdmin on Tue, 02/18/2025 - 09:56

Space Only Stands / Stands Built by You
Electricity is NOT included in the space only stand package. Electrical mains & power supply requirement must be ordered through the official supplier – GES. The appointed stand contractors must have their own distribution board (DB) or may order separately with GES. Go to ‘Actions/Links’ below to order Space Only electrics from GES

Electricity

Submitted by Sarah Dunne on Wed, 11/13/2024 - 12:29

Mains supply to space only sites and build up power is not included and must be ordered prior to the exhibition. Orders will not be processed until payment is received.

For Safety and Liability reasons, the installation of electrical power onto stands may only be undertaken by Global Experience Specialists (GES) who will ensure that all connections are verified as safe below use. 

Electricity

Submitted by Tony Sada on Mon, 10/14/2024 - 17:12

 Electricity included in your OFFPRICE Las Vegas booth package: One (1) 5 Amp/500Watt Electrical Outlet (per 2 booths)

If you require more amps/watts you may use the link below and order that through SES/Venetian Expo.

1. Click Order Additional Electricity at the bottom of this page
(right click on button to open in new tab)

2. Search "off-price" in the Venetian Expo event list

3. Click Go to Store to access event 

4. Log in or create an account to place order

 

Electricity

Submitted by Sarah Dunne on Thu, 08/22/2024 - 12:18

Mains supply to space only sites and build up power is not included and must be ordered prior to the exhibition. Orders will not be processed until payment is received.

For Safety and Liability reasons, the installation of electrical power onto stands may only be undertaken by Global Experience Specialists (GES) who will ensure that all connections are verified as safe below use. 

Electricity

Submitted by Rebecca Woodhouse on Thu, 08/01/2024 - 15:39

Fira Granvia have been appointed as the official electrical contractor for the show.  

If you have a space only stand, All electrical requirements, including switchboards, must be arranged through the Fira Store via the link below. Please note that all powerboxes will be protected with a 30 mA RCCB and will include power supply for the last two build-up days and all show days. If you require any something different or power supply for other days, these can be requested at labelexpo@firabarcelona.com.

Electricity

Submitted by Rebecca Woodhouse on Thu, 08/01/2024 - 15:38

Electricity is not included with the space only stands. You need to order your stand electricity requirements.  

Shell scheme stand electricity includes:  

  • 3 x spotlights LED with arm (yellow light) 
  • 1 x socket 500W 

If you need extra electricity for your shell scheme stand download the electrical form. 

Electricity

Submitted by Rebecca Woodhouse on Thu, 08/01/2024 - 15:37

SHELL SCHEME STANDS
Electricity for shell scheme stands includes:
•    1000W / 110V power supply
•    LED lighting

If you require additional electricity for your shell scheme stand, please download the Grupo SCH Electrical Form and submit your request through it.

Electricity

Submitted by Rebecca Woodhouse on Thu, 08/01/2024 - 15:35

Electricity is NOT included in the space only stands. You need to order your stand electricity requirements.  
 

For safety and liability reasons, the installation of electrical power onto stands may only be undertaken by Arab Expo, who will ensure that all connections are verified as safe before use. 

 

Electricity

Submitted by Jennie Manalang on Wed, 06/19/2024 - 12:54

GES has been appointed by the Organisers as the official contractor and are the only individuals permitted to carry out electrical installations.

Space Only Stands / Stands Built by You
Power is not included in the space only stand package. Electrical mains & power supply requirement must be ordered through the official supplier – GES. The appointed stand contractors must have their own distribution board (DB) or may order separately with GES.

Electricity

Submitted by Jennie Manalang on Mon, 04/15/2024 - 13:11

Space Only Stands / Stands Built by You
Power is not included in the space only stand package. Electrical mains & power supply requirement must be ordered through the official supplier – GES. The appointed stand contractors must have their own distribution board (DB) or may order separately with GES.

Packaged Stands / Stands Provided by Us (Show Ready / First Time Exhibitor / Vista Pods)
The following supply will be provided as part of the package:

Subscribe to Electricity