Space Only Exhibitors - Stands (Built by You)
Electricity is not included in the space only stand package. Please place your order for your electrical requirements through the official supplier GES - go to 'Actions/Links' below.

Shell Scheme Exhibitors - Stands (Provided by Us) / Turnkey Package
• 3 x LED arm lights per 12sqm
• 1 x 3-pin 500-watt electrical socket per stand
• Mains Power Supply and consumption
• You can order additional requirements through the official supplier GES - go to 'Actions/Links' below.

IMPORTANT:
The official contractor appointed by the Organisers are the only individuals permitted to carry out electrical installations. The official contractor for electrics to space only stands is GES. Orders must be placed through their ordering platform prior to the exhibition. Please note that your order will not be processed until payment is received. Build up and/or 24hrs power, if required; must be ordered separately. 

When completing the Electrical Order Form, the location of the items should be clearly marked on the grid plan, if you haven’t submitted a grid plan, your electrics will be placed at the discretion of the electricians, if you require these to be moved once installed, onsite charges will apply. 

Exhibitors installing their own power connections to their displays for general lighting and power sockets must ensure that:
• The main cable is connected to a suitable type distribution box
• The main switch should be an ELCB
• All wire joints are in connectors and concealed in junction boxes. No twisted wire joints are permitted
• All wires in exposed areas are protected in PVC trunking. Running wires under the carpet or across open areas is not permitted.

If the power supply ordered is to be connected to machines and equipment exhibitors must ensure that:
• A suitable type of isolator or ELCB is provided between the main cable and the cable from the machine / equipment
• If the machine / equipment has its own isolator, then the main cable can be directly connected to it

Exhibitors installing their own power connections to their displays must also ensure such installations conform to the IEE Regulations and will be subject to inspection and approval by the official electrical contractor before connections to the mains supply.   

The Organisers reserve the right to disconnect any installation that, in their opinion, is dangerous or likely to cause annoyance to visitors or other exhibitors. Please contact the official contractor GES to inquire for the standard supplies of electrical current available in the exhibition halls.

The provision of a single-phase mains supply terminal by suitable switchgear is included only in the shell scheme contract.  Three phase supplies and 24-hour connection can be ordered at an additional charge on the relevant form, go to 'Actions/Links' below.

General lighting is provided in the hall but is not powerful enough to provide adequate stand illumination.  Exhibitors are advised that specific illumination of their stands is considered essential to achieve an effective display.  For additional lighting please order this through GES. Please note that electrics to stands are switched off 30 minutes after the exhibition closes, please arrange 24-hour power, should you need it.

 