English

Electricity is NOT included in the space only stands. You need to order your stand electricity requirements.  
 

For safety and liability reasons, the installation of electrical power onto stands may only be undertaken by Arab Expo, who will ensure that all connections are verified as safe before use. 

 

Exhibitors/Contractors are required to provide their own extension leads, adaptors and power tools. All electrical equipment must be tested by a qualified electrician, including insulation and earth bonding tests, and clearly labelled with inspection labels. Due diligence must always be taken by the exhibitor/contractor and their qualified electrician. All power tools must be battery operated or 230 volts / 50hz or lower. Exhibitors/Contractors are responsible for electrical equipment to be properly wired and suitable to use within the venue. 

 

The organisers reserve the right to inspect, test and remove any electrical equipment which appears defective or has inadequate evidence of electrical inspection. Such inspection costs will be charged to the exhibitor. 

 

As the electricity supply is pulled from the venue floor to exhibitor stands, it is not possible to install or alter mains connections after stand construction has commenced. Stand power will be switched on 1 hour before the exhibition opens and off 30 minutes after it closes. If power is required outside these periods, including 24-hour power, please contact Arab Expo. Please note, additional charges will apply. Exhibitors/Contractors must order a sufficient number of sockets to prevent overloading. 

 

Shell scheme stand electricity includes:  

  • Spolight rail with 5 spotllights  
  • 1 x 3 pin socket 

 

If you need extra electricity for your Shell Scheme stand download the electrical form below. 

Space Only Exhibitors should use the order form in the link below for their electrical requirements. Please specify with Arab Expo if you require a power supply at a specific time (aside from the open hours of the show) i.e. 24 hours or during the build-up or breakdown period.  

The standard supplies are 220V and 380V with approximately 10% fluctuation. For safety of your equipment, please use a stabilizer.   

 

Order form access code: KSA2024 

Topic
Links
Event